In the Chioggia area, work to secure dumps has involved the former Val da Rio dump created between 1964 and 1984 with dumping of more than 500,000 m³ of waste. Erosion caused by wave motion and wash on the banks, dispersion through the sandy layers and rainwater leaching have led to dispersion of pollutants into the surrounding environment, making the need to secure the 7 ha area a matter of urgency. Work consisted largely of sealing the entire perimeter of the dump by installing a plastic membrane, metal sheet piling or both depending on the characteristics of the various areas. Complementary measures have also been completed to secure the area between the dump and the port.
Environmental protection of the Garbage Dump in the Val Da Rio Chioggia
1998 ÷ 2003 Site Supervision. Safety supervision for design and construction stage
Client: Ministry of Infrastructure - Amount of works: $ 13.133.261,04
Related Projects
-
Zalan is a concrete dam. Its typical cross section can be described as follows: • Height of the Dam: 24.50 m... -
This infrastructure project preparation concerns the regional competitiveness of the Vicenza, Padua and Rovigo... -
The project concerns the demolition of the existing steel and concrete bridge with three longitudinal bays and... -
A Contracts for Preliminary and Detailed Design for the construction of a concrete gravity dam in the Region... -
Qaziawa is a concrete gravity dam. Its typical cross section can be described as follows: • Height of the Dam:... -
Chami Rokhana dam is a mixed embankment-concrete dam. The embankment dam typical cross section can be... -
New steel Bridge with one central bay for the connection between the riversides of Canal Grande in Venice. -
The project interested about 9.5 km of major road (10.5 m width), from the current primary route S.S.128 with... -
Preliminary Design Executive Direction operational electrical and special systems -
Main features of the work: • catchment km² 103.67; • maximum stored volume m³ 7,808,360; • crest length m... -
Projects Description Palik is a zoned embankment dam with impervious core. Its typical section presents... -
• Type of the dam: Embankment, with some concrete elements for ancillary works on left side. Length of the... -
Overall coordination, collaboration in architectural design final and enforceable. Preliminary and final... -
Description of the activities 1 – Strengthening of civil line Improve Civil capacity that, during rainy... -
The project interested the link between the motorway toll gate at Piovene Rocchette (A31 highway) and the...



