Zalan is a concrete dam. Its typical cross section can be described as follows:
• Height of the Dam: 24.50 m from river bottom at dam axis;
• Stream Bed Level: 915.00 m a.s.l.;
• Width of the valley at the Dam site: about 30 m at the stream bed level;
• Crest elevation: 949.00 m a.s.l.;
• Crest width: 7 m;
• Length of the dam (at crest level): 150 m;
• Maximum Water Level: 944.00 m a.s.l.;
• Maximum Dam Operation Level: 939.50 m a.s.l.;
• Maximum capacity: 2’112’500 m3;
• Normal water level: 939.50 m a.s.l.;
• Dead Storage: 2’173 m3 (at a level of 917 m a.s.l.);
• Reservoir area: 0.17 km2;
• Catchment area: 456 km2;
• Spillway Project Flood: 1’372 m3/s (1’000 yrs Return Period);
• Spillway global length: 75 m.
CONCRETE GRAVITY DAM near ZALAN VILLAGE REGION OF KURDISTAN (IRAQ)
Activities: 2011 – 2012. Preliminary and Detailed Design
Client: Ministry of Agriculture and Water Resources (Iraq-Kurdistan) - Amount of works: US$ 27.600.710,00
Related Projects
-
The project concerns the demolition of the existing steel and concrete bridge with three longitudinal bays and... -
New steel Bridge with one central bay for the connection between the riversides of Canal Grande in Venice. -
Qaziawa is a concrete gravity dam. Its typical cross section can be described as follows: • Height of the Dam:... -
In the Chioggia area, work to secure dumps has involved the former Val da Rio dump created between 1964 and... -
The project interested about 9.5 km of major road (10.5 m width), from the current primary route S.S.128 with... -
This infrastructure project preparation concerns the regional competitiveness of the Vicenza, Padua and Rovigo... -
Projects Description Palik is a zoned embankment dam with impervious core. Its typical section presents... -
The project interested the link between the motorway toll gate at Piovene Rocchette (A31 highway) and the... -
A Contracts for Preliminary and Detailed Design for the construction of a concrete gravity dam in the Region... -
Description of the activities 1 – Strengthening of civil line Improve Civil capacity that, during rainy... -
• Type of the dam: Embankment, with some concrete elements for ancillary works on left side. Length of the... -
Overall coordination, collaboration in architectural design final and enforceable. Preliminary and final... -
Preliminary Design Executive Direction operational electrical and special systems -
Chami Rokhana dam is a mixed embankment-concrete dam. The embankment dam typical cross section can be... -
Main features of the work: • catchment km² 103.67; • maximum stored volume m³ 7,808,360; • crest length m...