Main features of the work:
• catchment km² 103.67;
• maximum stored volume m³ 7,808,360;
• crest length m 330,00, 10,00 m wide;
• maximum height from the crest to the clay core base 46.00 meters;
• slopes: upstream face 1V : 3H, downstream face 1V : 2,75H with three berms
2,00 m wide;
• excavation volume for cofferdam, dam, bottom outlet and spillway 500,000 m³;
• volume of the dam body including the cofferdam, clay core and shells
1,100,000 m³;
• concrete for bottom outlet, spillway and various works 12,000 m³;
• buildings and security guard services 800.00 m².
ZONED EARTHFILL DAM SHEWASOOR – REGION OF KURDISTAN (IRAQ)
Activities: 2011 – 2013. Constructive design, technical assistance in building and construction
Client: Ministry of Agriculture and Water Resources (Iraq-Kurdistan) - Amount of works: US$ 9.017.756
Related Projects
-
Projects Description Palik is a zoned embankment dam with impervious core. Its typical section presents... -
A Contracts for Preliminary and Detailed Design for the construction of a concrete gravity dam in the Region... -
Zalan is a concrete dam. Its typical cross section can be described as follows: • Height of the Dam: 24.50 m... -
Preliminary Design Executive Direction operational electrical and special systems -
In the Chioggia area, work to secure dumps has involved the former Val da Rio dump created between 1964 and... -
• Type of the dam: Embankment, with some concrete elements for ancillary works on left side. Length of the... -
The project interested the link between the motorway toll gate at Piovene Rocchette (A31 highway) and the... -
Qaziawa is a concrete gravity dam. Its typical cross section can be described as follows: • Height of the Dam:... -
New steel Bridge with one central bay for the connection between the riversides of Canal Grande in Venice. -
Chami Rokhana dam is a mixed embankment-concrete dam. The embankment dam typical cross section can be... -
Overall coordination, collaboration in architectural design final and enforceable. Preliminary and final... -
This infrastructure project preparation concerns the regional competitiveness of the Vicenza, Padua and Rovigo... -
The project concerns the demolition of the existing steel and concrete bridge with three longitudinal bays and... -
Description of the activities 1 – Strengthening of civil line Improve Civil capacity that, during rainy... -
The project interested about 9.5 km of major road (10.5 m width), from the current primary route S.S.128 with...