DEMOLITION AND TOTAL REBUILDING OF THE MUNICIPALITY BRIDGE ON BACCHIGLIONE RIVER

Activities: 2000 ÷ 2003. Preliminary, detail and final design. Site supervision, Safety coordination for design.
Client: Pontelongo Municipality - Amount of works: $ 1.246.760,78

The project concerns the demolition of the existing steel and concrete bridge with three longitudinal bays and the following rebuilding of the structure.