Drinking and waste water system managment in Chiampo River Valley

2007- Master Plan
Client: ATO Valle del Chiampo (Water Authority)

All the Italian territory has been divided into several homogeneous areas in order to implement the best management techniques in water cycle.

Local Authorities are therefore forced to implement a master plan which takes into account the existing situation, the foreseeable needs and the necessary actions to obtain the integrated management of the water cycle.

Particular attention is to be given to social-economics aspects Assessment activities aimed at hydraulic compatibility check of the new urban developments in according with the guidelines from hydraulic criticality plans.

en_HMR_mar_14_page73_image93

Related Projects