• Type of the dam:
Embankment, with some concrete elements for ancillary works on left side. Length of the embankment: 918 m
Length of concrete dam: 170 m
Total length: 1063 m
• Height of the dam: 54.5 m from river bottom
• Dam crest elevation: 361.5 m a.s.l.
• NWL: 350.0 m a.s.l.
• Max WL: ~ 356.3 m a.s.l. for flood of 1000 years RP
• Exceptional Max WL: ~ 359.6 m a.s.l. for flood of 10000 years RP and 2 blocked gates
• Min WL: ~ 335.5 m a.s.l.
• Reservoir capacity: 330 x 106 m3 at NWL, 520 x 106 at MWL
• Dead storage: 67.5 x 106 m3 at 333.0 m a.s.l.
• Reservoir area: 30 km2 at MWL
• Catchment area: 18500 km2
• Spillway; structure located on right side and consisting in two free sills and a gated sill – design flow: 16357 m3/s (1000 years RP).
EMBANKMENT DAM with EXTERNAL CONCRETE SPILLWAY near MANDAWA VILLAGE REGION OF KURDISTAN (IRAQ)
HomeDesign and Supervision EMBANKMENT DAM with EXTERNAL CONCRETE SPILLWAY near MANDAWA VILLAGE REGION OF KURDISTAN (IRAQ)
Activities: 2011 – in progress. Preliminary delivered and approved; Detailed Design nearing completion
Client: Ministry of Agriculture and Water Resources (Iraq-Kurdistan) - Amount of works: US$ 632.100.000
Related Projects
-
Zalan is a concrete dam. Its typical cross section can be described as follows: • Height of the Dam: 24.50 m...
-
Overall coordination, collaboration in architectural design final and enforceable. Preliminary and final...
-
Preliminary Design Executive Direction operational electrical and special systems
-
The project interested the link between the motorway toll gate at Piovene Rocchette (A31 highway) and the...
-
Qaziawa is a concrete gravity dam. Its typical cross section can be described as follows: • Height of the Dam:...
-
A Contracts for Preliminary and Detailed Design for the construction of a concrete gravity dam in the Region...
-
New steel Bridge with one central bay for the connection between the riversides of Canal Grande in Venice.
-
This infrastructure project preparation concerns the regional competitiveness of the Vicenza, Padua and Rovigo...
-
Main features of the work: • catchment km² 103.67; • maximum stored volume m³ 7,808,360; • crest length m...
-
The project concerns the demolition of the existing steel and concrete bridge with three longitudinal bays and...
-
Description of the activities 1 – Strengthening of civil line Improve Civil capacity that, during rainy...
-
Projects Description Palik is a zoned embankment dam with impervious core. Its typical section presents...
-
Chami Rokhana dam is a mixed embankment-concrete dam. The embankment dam typical cross section can be...
-
The project interested about 9.5 km of major road (10.5 m width), from the current primary route S.S.128 with...
-
In the Chioggia area, work to secure dumps has involved the former Val da Rio dump created between 1964 and...