Chami Rokhana dam is a mixed embankment-concrete dam.
The embankment dam typical cross section can be described as follows:
• dam crest elevation: 472.00 (m a.s.l.)
• minimum foundation elevation (core bottom): 441.00 (m a.s.l.)
• upstream and downstream face slopes (vertical/horizontal): 1:3 (-)
• overall embankment volume ~600,000 (m3)
The concrete dam typical cross section can be described as follows:
• Rankine triangle vertex elevation 469.00 (m a.s.l.)
• minimum foundation elevation (cutoff bottom): 438.00 (m a.s.l.)
• upstream face slope (horizontal/vertical) 0,1:1 (-)
• downstream face slope (horizontal/vertical) 0.75:1 (-)
It presents two typical cross section: a nonovertopping cross section (26.30 m) and an overtopping cross section (140.40 m). Nonovertopping cross section, of gravity type, is characterized as follows:
• dam crest elevation: 472.00 (m a.s.l.)
• dam crest width: 5.00 (m) (on the crest, a 4.00 m wide road is obtained)
• overall concrete volume (included outlet, intake and pumping station
~100,000 (m3)
Spillway weir elevation of overtopping cross section, is instead 467.00 (m a.s.l.).
MIXED EMBANKMENT-CONCRETE DAM near CHAMI ROKHANA VILLAGE REGION OF KURDISTAN (IRAQ)
HomeDesign and Supervision MIXED EMBANKMENT-CONCRETE DAM near CHAMI ROKHANA VILLAGE REGION OF KURDISTAN (IRAQ)
Activities: 2011 – 2012. Preliminary and Detailed Design
Client: Ministry of Agriculture and Water Resources (Iraq-Kurdistan) - Amount of works: US$ 44.315.612,00
Related Projects
-
Qaziawa is a concrete gravity dam. Its typical cross section can be described as follows: • Height of the Dam:... -
Main features of the work: • catchment km² 103.67; • maximum stored volume m³ 7,808,360; • crest length m... -
The project interested about 9.5 km of major road (10.5 m width), from the current primary route S.S.128 with... -
Zalan is a concrete dam. Its typical cross section can be described as follows: • Height of the Dam: 24.50 m... -
Description of the activities 1 – Strengthening of civil line Improve Civil capacity that, during rainy... -
Preliminary Design Executive Direction operational electrical and special systems -
New steel Bridge with one central bay for the connection between the riversides of Canal Grande in Venice. -
Overall coordination, collaboration in architectural design final and enforceable. Preliminary and final... -
The project concerns the demolition of the existing steel and concrete bridge with three longitudinal bays and... -
• Type of the dam: Embankment, with some concrete elements for ancillary works on left side. Length of the... -
The project interested the link between the motorway toll gate at Piovene Rocchette (A31 highway) and the... -
This infrastructure project preparation concerns the regional competitiveness of the Vicenza, Padua and Rovigo... -
Projects Description Palik is a zoned embankment dam with impervious core. Its typical section presents... -
In the Chioggia area, work to secure dumps has involved the former Val da Rio dump created between 1964 and... -
A Contracts for Preliminary and Detailed Design for the construction of a concrete gravity dam in the Region...