ZONED EARTHFILL DAM SHEWASOOR – REGION OF KURDISTAN (IRAQ)

Activities: 2011 – 2013. Constructive design, technical assistance in building and construction
Client: Ministry of Agriculture and Water Resources (Iraq-Kurdistan) - Amount of works: US$ 9.017.756

Main features of the work:
• catchment km² 103.67;
• maximum stored volume m³ 7,808,360;
• crest length m 330,00, 10,00 m wide;
• maximum height from the crest to the clay core base 46.00 meters;
• slopes: upstream face 1V : 3H, downstream face 1V : 2,75H with three berms
2,00 m wide;
• excavation volume for cofferdam, dam, bottom outlet and spillway 500,000 m³;
• volume of the dam body including the cofferdam, clay core and shells
1,100,000 m³;
• concrete for bottom outlet, spillway and various works 12,000 m³;
• buildings and security guard services 800.00 m².

Related Projects